ISDE: investment subsidy for sustainable energy and energy saving
- Deadline
- Unknown
- Sectors
- Construction & installation
- Provinces
- Throughout the Netherlands
What is happening
ISDE is open: applications have been possible since 5 January 2026. Changes for 2026: the starting amount for an air-to-water heat pump (first unit) is €1,025 (was €1,250), €225 per kW applies from the first kW, and the label bonus is €200.
Why it matters
Your customers can get a subsidy on installations and insulation you supply.
What you can do
Check the current amounts and equipment list at RVO and include the subsidy in your quotes.
The detailed radar shows the detailed explanation, the steps and the source link.
Open the detailed radar for €24,99/monthAlready a subscriber? Log inSource: RVO · Checked 13 October 2026
RadarApp provides information, not legal, tax or financial advice. We check sources but cannot guarantee coverage, accuracy or eligibility. Always check deadlines and conditions at the official source before applying or making a decision. No alert does not mean that nothing is happening.
Meer over deze branche
Bouw en installatie in 2026: subsidies voor je klant, regels voor jou
- DUMAVA – Duurzaam maatschappelijk vastgoed · Open · Deadline 16 October 2026
- SDE++ – aanvraagronde 2026 · Open · Deadline 26 November 2026
These sector pages relate to this signal.
- Construction & installation · Drenthe
- Construction & installation · Flevoland
- Construction & installation · Friesland
- Construction & installation · Gelderland
- Construction & installation · Groningen
- Construction & installation · Limburg
- Construction & installation · North Brabant
- Construction & installation · North Holland
- Construction & installation · Overijssel
- Construction & installation · Utrecht
- Construction & installation · Zeeland
- Construction & installation · South Holland
These signals may also be relevant.
- Cao Bouw & Infra: laatste loonstap 1,5% per 1 januari 2027, cao loopt tot 31 maart 2027
This signal is not yet available in English. The official source is in Dutch.
Legislation · Adopted · Deadline 1 January 2027 · for employers
- Cao Metaal en Techniek: eenmalig 132 euro in november 2026 en 115 euro per month erbij per 1 maart 2027
This signal is not yet available in English. The official source is in Dutch.
Legislation · Adopted · Deadline 1 November 2026 · for employers
- Cao voor Uitzendkrachten 2026-2028: gelijkwaardige beloning sinds 1 januari 2026, nieuw fasensysteem per 1 januari 2028
This signal is not yet available in English. The official source is in Dutch.
Legislation · In force · Deadline unknown · for employers
- DUMAVA: sustainable public-sector buildings
Grant · Open · Deadline 16 October 2026 · with the Construction & installation module