radarapp.
NL|EN
SchemesLog in
Grant
Open
Construction & installation module

SDE++: 2026 application round

Deadline
26 November 2026
Sectors
Construction & installation, Agriculture
Provinces
Throughout the Netherlands

What is happening

The SDE++ 2026 application round runs from 27 October to 26 November 2026, a month later than planned. RVO points out that incomplete applications are rejected and that all mandatory permits must already be in hand when applying.

Why it matters

For projects with renewable energy or CO2 reduction this round determines when an application can be made.

What you can do

Check the conditions at RVO and have your application ready before the round opens.

The detailed radar shows the detailed explanation, the steps and the source link.

Open the detailed radar for €24,99/monthAlready a subscriber? Log in

Source: RVO · Checked 13 October 2026

RadarApp provides information, not legal, tax or financial advice. We check sources but cannot guarantee coverage, accuracy or eligibility. Always check deadlines and conditions at the official source before applying or making a decision. No alert does not mean that nothing is happening.

Meer over deze branche

Agrarisch in het najaar van 2026: vier provincies, vier loketten

  • DUMAVA – Duurzaam maatschappelijk vastgoed · Open · Deadline 16 October 2026
  • ISDE – Investeringssubsidie duurzame energie en energiebesparing · Open · deadline unknown

These sector pages relate to this signal.

  • Construction & installation · Drenthe
  • Construction & installation · Flevoland
  • Construction & installation · Friesland
  • Construction & installation · Gelderland
  • Construction & installation · Groningen
  • Construction & installation · Limburg
  • Construction & installation · North Brabant
  • Construction & installation · North Holland
  • Construction & installation · Overijssel
  • Construction & installation · Utrecht
  • Construction & installation · Zeeland
  • Construction & installation · South Holland
  • Agriculture · Drenthe
  • Agriculture · Flevoland
  • Agriculture · Friesland
  • Agriculture · Gelderland
  • Agriculture · Groningen
  • Agriculture · Limburg
  • Agriculture · North Brabant
  • Agriculture · North Holland
  • Agriculture · Overijssel
  • Agriculture · Utrecht
  • Agriculture · Zeeland
  • Agriculture · South Holland

These signals may also be relevant.

  • Cao Bouw & Infra: laatste loonstap 1,5% per 1 januari 2027, cao loopt tot 31 maart 2027

    This signal is not yet available in English. The official source is in Dutch.

    Legislation · Adopted · Deadline 1 January 2027 · for employers

  • Cao Metaal en Techniek: eenmalig 132 euro in november 2026 en 115 euro per month erbij per 1 maart 2027

    This signal is not yet available in English. The official source is in Dutch.

    Legislation · Adopted · Deadline 1 November 2026 · for employers

  • Cao voor Uitzendkrachten 2026-2028: gelijkwaardige beloning sinds 1 januari 2026, nieuw fasensysteem per 1 januari 2028

    This signal is not yet available in English. The official source is in Dutch.

    Legislation · In force · Deadline unknown · for employers

  • DUMAVA: sustainable public-sector buildings

    Grant · Open · Deadline 16 October 2026 · with the Construction & installation module

All schemes by sector and province

radarapp.
NewsGidsenSchemesReportFor accountantsPrivacyTerms and conditions

The Dutch version is binding. Dutch law applies.

support@radarapp.nl

© 2026 RadarApp

RadarApp provides information, not legal, tax or financial advice. We check sources but cannot guarantee coverage, accuracy or eligibility. Always check deadlines and conditions at the official source before applying or making a decision. No alert does not mean that nothing is happening.

Edit with